> Newly built data centres in so-called national hub nodes must use at least 80% green electricity, while targets for the other industries vary by province.
For example "red mud" is a waste output of aluminum production.
"Green steel from red mud through climate-neutral hydrogen plasma reduction" (2024) https://www.nature.com/articles/s41586-023-06901-z
> Newly built data centres in so-called national hub nodes must use at least 80% green electricity, while targets for the other industries vary by province.
For example "red mud" is a waste output of aluminum production.
"Green steel from red mud through climate-neutral hydrogen plasma reduction" (2024) https://www.nature.com/articles/s41586-023-06901-z